Alfred Gelder Street Highway Improvements

Alfred Gelder Street Highway Improvements

Hull, East Yorkshire
£420,000.00
8 weeks

C R Reynolds Limited was appointed by Hull City Council to undertake highway improvement works on Alfred Gelder Street, a key route within Hull city centre. The scheme was originally developed to deliver carriageway resurfacing and concrete carriageway repairs; however, during contract development the scope was expanded to include the installation of a new signal-controlled pedestrian crossing, associated footway improvements and highway buildouts to enhance pedestrian safety and accessibility.The project was particularly programme-sensitive due to its reliance on an existing road closure associated with maintenance works on Drypool Bridge. All activities had to be carefully coordinated to ensure completion before the road network returned to normal operation. Through detailed planning, innovative programming and close collaboration with the client, all works were successfully delivered within the closure period.

Project work elements included:

  • Plane-off of existing carriageway surfacing to expose the concrete sub-base.
  • Concrete carriageway repairs.
  • Kerbing and channelling improvements.
  • Installation of two new bus stops.
  • Footway reconstruction, including paving, tactile paving, block paving and flagging.
  • Ducting installation and traffic signal works for a new pedestrian crossing.
  • Carriageway regulating and resurfacing works.
  • Road markings and anti-skid surfacing application
  • 8-week construction programme.
  • 2,200m² carriageway resurfaced.
  • 150m of new kerbing installed.
  • 350m² footway reconstruction completed.
  • Defect-free project handover.
  • Delivered within a critical city-centre road closure window.
  • Positive stakeholder feedback from local businesses.

The Project Works

The works comprised a comprehensive package of highway improvements, including carriageway reconstruction, pedestrian infrastructure enhancements and traffic signal installation. Key activities included:

  • Plane-off of existing carriageway surfacing to expose the concrete sub-base.
  • Concrete carriageway repairs.
  • Kerbing and channelling improvements.
  • Installation of two new bus stops.
  • Footway reconstruction, including paving, tactile paving, block paving and flagging.
  • Ducting installation and traffic signal works for a new pedestrian crossing.
  • Carriageway regulating and resurfacing works.
  • Road markings and anti-skid surfacing application.

Design Development and Value Engineering

Although provided as a client-designed scheme, early site investigations identified several challenges that could have affected programme delivery and long-term performance. Existing carriageway conditions differed significantly from the original design assumptions, including poor concrete sub-base conditions, varying surfacing depths and inadequate levels for surface water management.

Given the compressed programme and limited opportunity for redesign, C R Reynolds Limited worked collaboratively with Hull City Council and specialist subcontractors to develop practical engineering solutions that could be implemented within the existing programme. These included:

  • Revising carriageway levels to improve drainage performance.
  • Developing revised surfacing build-ups to accommodate varying existing conditions.
  • Introducing reinforcement grid systems in areas of poor concrete condition.
  • Adjusting construction phasing to maximise productivity and minimise road closure durations.

This proactive approach enabled construction to proceed without delay while maintaining specification requirements and long-term asset performance.

Project Challenges and Solutions

The primary challenge was the highly constrained programme. The works had to be completed within a pre-determined road closure window that was linked directly to maintenance activities on Drypool Bridge. Failure to complete within this period would have resulted in significant disruption to the city's traffic network.

To mitigate this risk, the project team developed a carefully phased construction programme that maximised productivity during full road closure periods while relocating certain activities into localised traffic management arrangements where practicable. This strategy minimised disruption and ensured that critical works were completed on schedule.

Additional challenges included unforeseen carriageway conditions and drainage-level constraints. These issues were resolved through rapid engineering reviews and collaborative working between the site team, subcontractors and client representatives. The resulting solutions received positive feedback from the client and ensured programme continuity throughout the scheme.

Stakeholder Management

Located within a busy commercial area, the project required careful management of local businesses, pedestrians and road users. The project team implemented a comprehensive communication strategy that included:

  • Weekly stakeholder updates.
  • Look-ahead programmes.
  • Attendance at stakeholder meetings.
  • Coordination of deliveries and waste collections.
  • Ongoing engagement with local businesses.

This proactive approach proved particularly successful. Businesses including local hospitality venues, which had previously voiced concerns regarding earlier highway works, welcomed the regular communication and were complimentary about the management and delivery of the scheme.

Result

Quality assurance was embedded throughout delivery, with inspections and snagging undertaken during construction rather than at project completion. This approach enabled defects to be identified and rectified immediately, resulting in a defect-free handover.

The completed scheme was delivered on programme and to the full satisfaction of Hull City Council, providing improved road condition, enhanced pedestrian accessibility and upgraded public transport infrastructure.

The Difference We Made

The Alfred Gelder Street Highway Improvements Scheme successfully transformed a key city-centre route, improving carriageway condition, pedestrian safety, accessibility and public transport infrastructure.

Delivered within a highly constrained programme linked to wider city traffic management arrangements, the project demonstrated CR Reynolds Limited's ability to provide engineering expertise, collaborative problem-solving and stakeholder-focused delivery within complex urban environments.