CR Reynolds was appointed as Principal Contractor by Associated British Ports (ABP) to deliver Plot 1 at Stallingborough Interchange, a major industrial and logistics development in North East Lincolnshire.The project transformed a greenfield site into a fully serviced commercial development comprising industrial warehouse accommodation, development platforms, roads, drainage infrastructure, utilities, external works and landscaping. Working closely with the client, designers and project stakeholders, CR Reynolds delivered the enabling works, infrastructure and building construction required to create high-quality industrial space capable of supporting future occupiers and business growth.The development required significant earthworks, drainage and utility infrastructure before construction of the commercial units could commence, with the project team coordinating multiple disciplines throughout the construction lifecycle to ensure efficient delivery.
Project work elements included:
- Bulk earthworks and cut and fill operations.
- Formation of development plateaus and working areas.
- Site-wide drainage and attenuation infrastructure.
- Culvert and water management works.
- Utility installations and service coordination.
- Roads, parking areas and hardstanding construction.
- Industrial warehouse unit construction.
- Structural steel frame erection.
- Cladding and roofing installations.
- External works and landscaping.
- Lighting, security and associated infrastructure.
- 29,000m³ of earthworks completed.
- 27,500m³ of excavated material reused on-site.
- More than 95% of site-won material retained for beneficial reuse.
- Landfill diversion rate exceeding 98% by volume.
- 100% recycling of recorded construction and demolition waste streams.
- Zero waste sent to landfill.
- Use of site-won material within engineering fill, landscaping and temporary works.
- No environmental enforcement actions, pollution incidents or waste management non-conformances recorded.
The Project Works
The project commenced with extensive enabling works including site clearance, bulk earthworks and development platform construction. Approximately 29,000m³ of material was excavated, placed and compacted to establish formation levels and prepare the site for future development.
CR Reynolds delivered:
- Bulk earthworks and cut and fill operations.
- Formation of development plateaus and working areas.
- Site-wide drainage and attenuation infrastructure.
- Culvert and water management works.
- Utility installations and service coordination.
- Roads, parking areas and hardstanding construction.
- Industrial warehouse unit construction.
- Structural steel frame erection.
- Cladding and roofing installations.
- External works and landscaping.
- Lighting, security and associated infrastructure.
Project Challenges & Solutions
The scheme presented several technical and logistical challenges that required detailed planning and collaboration.
The site required significant earthworks and infrastructure works before vertical construction could commence, alongside careful management of existing drainage features, utility constraints, ground conditions and flood risk considerations.
During construction, the development also evolved in response to occupier demand when Units 7 and 8 were purchased and redesigned to create a larger combined facility. Working collaboratively with the client and design team, CR Reynolds successfully adapted construction activities and sequencing to accommodate the revised requirements whilst maintaining progress across the wider development.
Through proactive planning, stakeholder engagement and effective project management, the team successfully delivered a flexible development capable of meeting changing commercial requirements.
Result
The successful completion of Plot 1 has created a modern industrial and logistics development supported by extensive infrastructure, development platforms and commercial accommodation.
The project's successful adaptation to changing occupier requirements, including the reconfiguration of Units 7 and 8 during construction, demonstrates CR Reynolds' ability to deliver flexible development solutions while maintaining programme certainty, quality standards and stakeholder confidence.
The Difference We Made
By combining enabling works, infrastructure delivery and building construction under a single contract, CR Reynolds successfully transformed a greenfield site into a high-quality business destination ready to support future industrial and logistics occupiers.