Queens Gardens Regeneration Scheme

Queens Gardens Regeneration Scheme

Hull, East Yorkshire
£19,300,000.00
157 weeks

Following a competitive tender process, CR Reynolds Ltd was appointed as Principal Contractor to deliver the Enabling Works, Phase 1 and wider public realm improvements for the regeneration of Queens Gardens in Hull city centre. As a key element of the wider Hull Maritime Project, the scheme sought to transform one of the city's most valued public spaces while celebrating its rich maritime heritage and improving accessibility, biodiversity, sustainability and public amenity. Throughout the project, CR Reynolds worked collaboratively with Hull City Council, designers, stakeholders and specialist supply chain partners to successfully deliver a complex programme of heritage restoration, civil engineering, landscaping and public realm works within a busy urban environment. Early Contractor Involvement (ECI) facilitated design development, buildability reviews, utility coordination and value engineering opportunities, ensuring efficient delivery while maintaining the quality and integrity of the scheme.

Project work elements included:

  • 64 new trees planted
  • 671 steps installed
  • 424m of balustrades installed
  • 7,468m² of paving constructed
  • Full SuDS and surface water drainage infrastructure installed
  • Rose Bowl Fountain fully restored
  • Bandstand relocated to Pickering Park
  • 260+ hours of training delivered
  • 3 local apprentices supported
  • Supported Internship placement delivered
  • Attendance at local careers events
  • Support provided to community projects and charities
  • Extensive public realm, highways, landscaping and accessibility improvements completed.

The Project Works

The project commenced with a comprehensive Enabling Works package which included the sympathetic restoration of the historic Rose Bowl Fountain. Works comprised extensive structural repairs, refurbishment and repainting works, together with the installation of a new mechanical and electrical package. CR Reynolds also undertook the careful demolition of a redundant café building and the dismantling, transportation and relocation of the existing steel bandstand structure to Pickering Park.

Phase 1 and subsequent public realm works included significant site clearance, excavation and demolition activities, including the removal of existing retaining walls, kerbing, pond copings and redundant hard landscaping. Existing Yorkstone paving was carefully removed, cleaned and retained for reuse throughout the development. New reinforced concrete retaining walls were constructed alongside new access ramps, steps and pedestrian routes to improve accessibility throughout the gardens. In total, 671 new steps and 424 metres of balustrades were installed.

Extensive infrastructure improvements were carried out, including the installation of Sustainable Drainage Systems (SuDS), new surface water drainage networks, attenuation systems, utility diversions and a new electrical substation. Mechanical and electrical infrastructure upgrades supported the installation of feature lighting, street lighting, street furniture and public realm enhancements throughout the site.

The landscaping package involved the felling of selected trees, planting of 64 new trees, installation of rain gardens and extensive soft landscaping works designed to enhance biodiversity and improve seasonal interest within the gardens. Approximately 7,468m² of paving was installed using six high-quality surface materials, including reused Yorkstone, recycled sandstone, Holcombe sandstone, granite, corduroy paving and Ulticolour Tarmac. Additional highways works included resurfacing and public realm improvements along Guildhall Road and surrounding streets.

The project required careful protection and preservation of numerous heritage assets, including the Solar Gate, Yorkshire Water drinking fountain, Robert Adams wall sculpture, opening plaque, Frederick Gibberd drinking fountain and Kenneth Carter artworks. A lost artwork was recreated using traditional methods and reinstated within the gardens. Existing granite mooring bollards reflecting the site's former dock heritage were retained and protected throughout the works.

Social value formed a key element of project delivery, with CR Reynolds providing more than 260 hours of training, supporting local careers events, providing supported internship opportunities, assigning three apprentices to the project and supporting local community initiatives. Through robust project management, quality control and collaborative working, all works were successfully delivered by CR Reynolds' in-house Project Delivery Team, supported by trusted specialist supply chain partners. The successful completion of the Enabling Works and Phase 1 resulted in CR Reynolds being awarded the subsequent phase of this prestigious city-centre regeneration scheme.

Result

The regeneration of Queens Gardens has transformed one of Hull's most important civic spaces, delivering improved accessibility, enhanced biodiversity, sustainable drainage infrastructure, heritage restoration and high-quality public realm improvements.

The successful delivery of Enabling Works and Phase 1 resulted in CR Reynolds being awarded subsequent phases of the development, demonstrating the client's confidence in the company's ability to deliver complex, high-profile regeneration projects.

The Difference We Made

As a key element of the wider Hull Maritime Project, the scheme sought to transform one of the city's most valued public spaces while celebrating its rich maritime heritage and improving accessibility, biodiversity, sustainability and public amenity. 

The scheme incorporated Sustainable Drainage Systems (SuDS), attenuation infrastructure, rain gardens, biodiversity improvements and the planting of 64 new trees. Existing Yorkstone and other materials were carefully recovered and reused where possible, supporting the project's sustainability objectives and reducing waste.